Akpan, E O P and Igwe, O (2001) Methodology for Determining Price Variation in Project Execution. Journal of Construction Engineering and Management, 127(05), 367–73.

Chevallier, N J and Russell, A D (2001) Developing a Draft Schedule Using Templates and Rules. Journal of Construction Engineering and Management, 127(05), 391–8.

El-Diraby, T E and O'Connor, J T (2001) Model for Evaluating Bridge Construction Plans. Journal of Construction Engineering and Management, 127(05), 399–405.

Elinwa, A U and Joshua, M (2001) Time-Overrun Factors in Nigerian Construction Industry. Journal of Construction Engineering and Management, 127(05), 419–25.

Henry, E and Brothers, H S (2001) Cost Analysis between SABER and Design Bid Build Contracting Methods. Journal of Construction Engineering and Management, 127(05), 359–66.

  • Type: Journal Article
  • Keywords:
  • ISBN/ISSN: 0733-9364
  • URL: https://doi.org/10.1061/(ASCE)0733-9364(2001)127:5(359)
  • Abstract:
    The majority of Air Force construction is performed by two main contractual methods, design bid build (DBB) and simplified acquisition of base engineering requirements (SABER). DBB is the traditional contracting method in which each project is competitively bid. SABER uses one contractor to complete multiple projects using unit prices established in the original contract. This research performs a cost analysis between DBB and SABER construction projects. The research involved finding appropriate, comparable projects completed by the two contractual methods. Two diverse Air Force bases were used to gather project information, and a total of 46 interior renovation projects were used. Project comparability was demonstrated by evaluating the similarity of type and scope of work. Data from the projects was used to calculate unit cost per dimensional characteristic and time and cost growth for each project. The results indicated SABER contracting had a lower cost per square meter, although not at a statistical level of significance. SABER performed better in time growth. Cost growth was similar for both methods.

Kang, L S, Park, I C and Lee, B H (2001) Optimal Schedule Planning for Multiple, Repetitive Construction Process. Journal of Construction Engineering and Management, 127(05), 382–90.

Seo, S and Hwang, Y (2001) . Journal of Construction Engineering and Management, 127(05), 414–8.

Thorpe, T and Mead, S (2001) Project-Specific Web Sites: Friend or Foe?. Journal of Construction Engineering and Management, 127(05), 406–13.

Yamín, R A and Harmelink, D J (2001) Comparison of Linear Scheduling Model (LSM) and Critical Path Method (CPM). Journal of Construction Engineering and Management, 127(05), 374–81.

Zhang, X Q and Kumaraswamy, M M (2001) Procurement Protocols for Public-Private Partnered Projects. Journal of Construction Engineering and Management, 127(05), 351–8.